
Mills
Asphalt Plant - Driving "Jaw" type Rock Crusher
The flywheel driving this open rock crusher requires 60 seconds to achieve maximum speed. Due to the remote location of this quarry, power is supplied by a local generator incapable of supplying starting current greater than 3 times the nominal current.



